Southern Parkway Pavement Rehabiliation

Years
2022-2023
Location
Nassau, Suffolk
Contract Amount
$24,500,000
CSM Services
Highways/Roads
Owner
NYSDOT

PROJECT BRIEF

D038160 -(Constr. No. 264638) Resurface of the asphalt riding surface on the Southern State Parkway (908M) Grand Avenue (Exit 20) to NYS Route 110 (Exit 32) in Nassau and Suffolk Counties to a smooth and distress free condition by milling and resurfacing the existing pavement. Work will include milling 2” of the existing asphalt riding surface and replacing it with new hot mix asphalt. Road shoulders and ramps are included. Also included are some isolated full depth pavement repairs as well as new pavement markings. ITS elements such as traffic loops within contract limits will be replaced in kind under this project. Also included are drainage work including but not limited to, frame and grate adjustments, frame and grate replacement, clearing of blocked pipe, cleaning of drainage structures and other work as existing conditions dictate. Region 10 PIN # 0534.80.325 Federally Funded

CERTIFIED BY

GET IN TOUCH WITH CSM ENGINEERING

Fill out my online form.
logo-light
back top