Roslyn Viaduct, NY 25A Highway

Years
2012-2015
Location
Nassau
Contract Amount
$25,000,000
CSM Services
Highways/Bridges
Owner
NYSDOT

PROJECT BRIEF

D025535-02 -(Constr. # D261853) Construction Inspection services for the complete replacement of the viaduct through the use of a modified alignment and staged construction incorporating innovative design schemes to minimize traffic congestion. Staging included maintenance of 3 lanes of traffic (min.) at all peak travel periods. Appurtenance from Center Dr. to Forrest Dr.,PIN # 0328.04.301

CERTIFIED BY

GET IN TOUCH WITH CSM ENGINEERING

Fill out my online form.
logo-light
back top