Preventive Maintenance Initiative: Palisades Interstate Parkway & Taconic State Parkway

Years
2020- 2021
Location
Upstate
Contract Amount
$22,700,000
CSM Services
Highways/Roads
Owner
NYSDOT

PROJECT BRIEF

D037849-02 -(Constr. # D263971, D263996) Construction inspection services for the Preventive Maintenance Initiative (PMI) project on the Palisades Interstate Parkway (PIP) and the Taconic State Parkway (TSP). PIP: Milling 1 1/2 "" of asphalt and fill with 12.5mm top course. Pavement repairs, drainage basins, ditches and gutters will be addressed as needed. TSP: Milling 1 1/2 "" of asphalt and fill with 12.5mm top course. Pavement repairs as necessary, drainage basins, ditches and gutters. Putnam & Rockland Counties, Region 8, PIN #8814.05.321/8127.45.321Federally Funded

CERTIFIED BY

GET IN TOUCH WITH CSM ENGINEERING

Fill out my online form.
logo-light
back top